- Instructions:
-
The following Installation Instructions have been provided for your assistance. If you are in need of additional instructions that are not provided on this page, please contact Customer Support .
You are invited to download and share any and all of the documents provided on this page for your reference.
Directions:
To obtain a document, simply click on the name of the document that you wish to download from the list on the left. Then click the document download link that appears in this box. A brief description has been provided for each document. Once clicked, the document should open or begin downloading immediately. - 1. Installing YearText
-
Installing/Mounting Vinyl Lettering Yeartext
Download - UPDATED - YearText Mounting Instructions
This document provides a brief tutorial on how to install and mount Yeartext Vinyl lettering legends and banners on backgrounds with or without a border. Pictures as well as written directions are included in this set of instructions.
- 2. How to Assemble Standoffs
-
Meeting Schedule Standoff Rear Assembly
Download - Meeting Schedule - Standoff Rear Assembly Instructions
This document provides a instructions for assembling all Meeting Schedules which include the "Rear Assembly" Standoff Package.
This standoff package is assembled from the rear of the Meeting Schedule background panel. These instructions apply to Meeting Schedule Models: SP-A1-10 and SP-MA1-10
For signs with Acrylic panels, be sure to remove the protective paper backing on the (rear side of the) face before installing it on the standoffs as depicted in the installateion photo. Also you may wish to remove any protective backing from the rear of the back panel.
- 3. Installing Meeting Schedules
-
- Intstalling Meeting Schedule with Standoffs into Wood brace/bracket
Download - Meeting Schedule - Installing Standoffs into Wood Surfaces
This document provides a instructions for installing Meeting Schedules with Standoff Packages into wood braces, brackets or cleats.
These instructions apply to Meeting Schedule Models: SP-A1-10 and SP-MA1-10
- Intstalling Meeting Schedule with Standoffs onto Brick/Stone wall
Download - Meeting Schedule - Installing Standoffs onto Brick/Stone
This document provides a instructions for installing Meeting Schedules with Standoff Packages onto a Brick or Stone wall.
These instructions apply to Meeting Schedule Models: SP-A1-10 and SP-MA1-10
For signs with Acrylic panels, be sure to remove the protective paper backing on the (rear side of the) face before installing it on the standoffs as depicted in the installateion photo. Also you may wish to remove any protective backing from the rear of the back panel.